Built the two cupola stack assemblies. The platforms were made from .060 scraps (cutoffs from building core) and .040 styrene decks. The stacks are thin-wall PVC with Evergreen channel and vac-formed tops. Also worked on overhead pipe and support assembly for dust collector building and cleaned up and primed the water tower.
The subject matter of this blog is the Steel Industry and Railroading. Most of the posts deal with my attempt to model an integrated steel mill in HO scale, however, there will also be posts on real railroading and the real steel industry as well as other industries, and for that matter, general topics, that interest me.
Tuesday, August 18, 2009
PIPE FOUNDRY Part-8
Built the two cupola stack assemblies. The platforms were made from .060 scraps (cutoffs from building core) and .040 styrene decks. The stacks are thin-wall PVC with Evergreen channel and vac-formed tops. Also worked on overhead pipe and support assembly for dust collector building and cleaned up and primed the water tower.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment