Thursday, July 30, 2009

PIPE FOUNDRY Part-1


We cut the walls from .060 styrene and used .125x.125 square strip for the corners with larger .060 triangular supports where needed.  From the picture you can see the scrap loading dock with the two holes cut in it, the hole for the coke conveyor, the main line pass thru, and the open side of the cupola house.   After some additional reinforcing, the addition of the visible interior steel framing, the concrete floor of the cast house, and the roof panels we will cover the whole structure with corrugated siding and then begin work on the details.

No comments: