The subject matter of this blog is the Steel Industry and Railroading. Most of the posts deal with my attempt to model an integrated steel mill in HO scale, however, there will also be posts on real railroading and the real steel industry as well as other industries, and for that matter, general topics, that interest me.
Thursday, June 25, 2009
A-FURNACE PART 17
I added the mixer line between the cold blast main and the hot blast main. In the prototype this pipe, in conjunction with a valve yet to be built, was used to regulate the temperature of the hot blast. The pipe is 3/8" styrene tubing and the supports are Tichy platform supports. Most of the cuts are 11 degree angles.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment