Thursday, June 25, 2009

A-FURNACE PART 17


I added the mixer line between the cold blast main and the hot blast main.  In the prototype this pipe, in conjunction with a valve yet to be built, was used to regulate the temperature of the hot blast.  The pipe is 3/8" styrene tubing and the supports are Tichy platform supports.  Most of the cuts are 11 degree angles.  

No comments: