Monday, May 28, 2012

S.S. VALHALLA - Part 6

We spent the morning marching in the local Memorial Day parade with Jimmy's Boy Scout Troop - Southampton Troop 31.  We had a beautiful day and the walk was a time to reflect on all those, alive and dead,  that gave so much serving our country.


On the modeling front I've pulled the S.S. Valhalla back into drydock to do a bit more work on her.
Adding railings, stair/ladders, lifeboat davits,..etc.
Forecastle - added anchor windlass, an inexpensive resin kit I think from Sylvan.  Also more railings, ladders, bollards, and boom pivot posts.  Holds are next.  Pipe railings are from Central Valley - You get four pretty long ones out of one $6 pack, plus lots of fencing and ladders left over.

Thursday, May 24, 2012

TREADWELL 200 TON BOTTLE CAR - Part 4

My 28" wheels arrived at Sattler's Trains in Westmont, NJ fairly quick.  I took some basic Athearn trucks and switched out the sets.  I realize that the truck style might not be correct but close enough for my liking right now.   You can see the difference using the smaller wheels -
28" wheels on left
I had to do some cutting and filing to get the trucks situated on their bolsters with just barely enough clearance between the wheels and the underside of the end frames.  I then mounted the four trucks, and drilled and mounted the truck bolster frame to the bottle car trunion end.  Everything swiveled well.  I then attached a coupler and took the car out for a spin.  I quickly realized how touchy these dual trucks can be.  In the prototype the tremendous weight of the bottle section kept the truck bolster assembly balanced and pressed on the rails.  In the model version the bottle is not heavy enough to keep the wheels on the rails as well.  I tweaked things a little and improved the operating characteristics of the car quite a bit, but still not bullet proof.  I need to hollow out the bottle more and get some lead down low.  I also need to use some washers and maybe a little filing to balance out the ends better.
Test driving the car - in front of the Raritan Steel Pig Caster
One final note - I built this car so the bottle can be rotated - This I think will cause running problems as when the car takes a tight curve the bottle tends to rotate a little, but friction holds it in place when things straighten up and this lifts one side of the wheels off the rails.  I don't really want to glue it after all that work to keep it operational, however, maybe a locking pin on each end.


Monday, May 21, 2012

DORR THICKENER - Part 2

Most of the work left on this model is related to the central rotating assembly and it's associated walkway.
Adding the vanes
First, I added vanes to the rotating arms using Evergreen .100 I beam.

Then I fabricated the upper assembly on the rotating core using a variety of styrene shapes.  I also added a Plastruct motor.

Finally, putting it all together, I added some walkways and piping.  All the pieces are removable for painting.  Some more piping and details and it will be ready for paint and fake water

Thursday, May 17, 2012

DORR THICKENER - Part 1

I have a little real estate available immediately behind A-Furnace stoves and thought that a Dorr Thickener would fit nicely.   The nearby precipitators and gas washers would no doubt produce a lot of waste water needing treatment.   Several modelers have built very nice Dorr Thickeners out of CD cases.  I considered this, however,  it would have been hard to fit two in my space, but one larger one would work well.  For the tank I used a 6" PVC pipe coupling.  I carefully cut it down using a table saw.  It is attached to a .060 styrene base that extends past the tank walls slightly.  In the center I attached a 7/16" tube that the rotating arm assembly will sit on.  There is also an upper ring that I attached.
Dorr tank, footing, and assembling the top ring

For the rotating assembly I used mostly Walther's conveyor kits - not the "Modern Conveyor" with the curved roof, but rather, the smaller squarish conveyor - just called conveyor kit.   The core is a 1/2" piece of Evergreen tubing surrounded by framework from the conveyor kit.  The arms of the rotating assembly are the same conveyor kit frames, but glued up in triangular sections.
Rotating assembly
Testing for fit

Tuesday, May 15, 2012

B-FURNACE - Part 14

Another blast (furnace) from the past - haven't updated this project in a year or two.  The bottle car, while I'm eager to finish it, is delayed, waiting for Kadee 28" wheelsets to arrive.  There was a recent vigorous online discussion on wheel sizes of bottle cars on the yahoo steel group.  Mostly between 36" and 33", however, the plans I'm working off of call for 28" sets.  I'm already slightly out of scale on my platforms and this has unfortunately lifted the bottle higher off the rails than shown in the plan.  So, even 5 scale inches will help me tweak things to get the bottle closer to the prototype appearance.   I realized that this might even have something to do with the larger diameter of the Walther's car when compared to my prototype scaled Treadwell bottle.  Anyway, I'm hoping I see these wheels soon.
Partially, expanded platform and stair tower
If this photo was a repeat, I apologize.  I felt like I hadn't gotten the lower platform right  - too small - so I expanded it.  I fretted briefly as I worried that a square platform wasn't prototypical, but then found a few prototype furnaces with just that arrangement.  The stair tower is from the Walther's Ethanol Tank detail kit.  This is getting a bit hard to find, but extremely useful for steel mill modelers.  Each package comes with two stair towers (the one shown is one and a half I think) and a variety of piping, platform, railings,...etc.. for under $20.   The towers can be combined with a little forethought and cutting to reach unlimited heights.  Right now it stands out against the white styrene, but once painted will look right at home.   You will notice I also ditched the large Plastruct rings I'd previously glued on top of the uptakes to represent the bleeders.   I've also added some 5/32 H-Column bracing to the upper furnace stack.
Styrene core of B-Furnace casthouse.  Just sitting on the edge of the layout - not in the proper location
My failing is that I get too worried about the small details, almost to the extent that my modeling gets paralyzed.  Hesitant to take the next step until I first do this or that just right.  This is why I haven't updated this construction thread for over a year.   All this said, I'm trying to increase my modeling velocity and make some serious progress - and worry about the details later.  The upcoming Steel Mill Modelers Meet in August  and the 100 or so modelers that will be visiting my layout  at that event are helping with the motivation too.   (Don't forget to register and make the hotel reservations - go to the Peach Creek Shops link on this page for the registration forms and hotel information)

The A-Furnace casthouse has been under construction for some time now - a single truss, built out of probably 100 pieces of styrene took me a night or two to build, plus lots of styrene.  The B-Furnace casthouse seemed even further away with nothing built.  Finally realizing this, I thought - stop worrying - built a casthouse using a styrene core and forget the interior - the small slag pour area can be modeled, although its view lines are mostly blocked by the blowing engine house anyway.   So in two short evenings I had the core of the casthouse built using .060 plastic sheet and miscellaneous bracing - plenty of bracing.  I'll laminate the sides with .040 corrugated metal siding sheets from Evergreen and then the roof is a lapped sheet panel design.   I left the hole for the blast furnace large so for now it's removable.  Before I finish the roof, I'll spray the casthouse, detail the exposed area, and install some UV LEDs  - and paint the foundation and sides of the structure.  Then I'll glue the stack in place and install the roof panels right up to it.   But first some louvers on the one end.  
Louvers
I cut two large holes and using some strips from the scrap box made up these two louvers.  The plastic is slightly heavy, I believe .040, but I was worried lighter material would sag over time.  After shooting the close up photo I was a little worried about the inconsistent nature of the louvers, however, most of those you see in steel mill photos are more than a little bent, missing, or generally in disrepair.   I'll bring the styrene siding right up to the edge of the louver frames.

Wednesday, May 9, 2012

FERROMANGANESE PRODUCTION - Part 1

This will be an ongoing thread about ferromanganese production at my Raritan Steel complex.  I've mentioned, I think, in previous posts about modeling ferro operations.  My motivation is that it will add some operational interest, along with having some unique structures to model.

The premise is that periodically,  B-Furnace will go into ferro production - to supply Raritan Steel at Perth Amboy, but also other Raritan Plants.  Centralized production of this product so to speak.   In the early 1950s many of the large steel companies were doing this very thing.  I am basing my modeling on the prototype example at USS Duquesne.  Using blast furnaces to produce ferro was a short lived thing in the 1950s  as electric furnaces were already taking this over.    Much of the process was the same, just manganese iron ore was used.  But, there were differences in the handling of the product, and the most significant, the handling of the waste gases.   The latter wasn't much of an issue until the 1950's as the steel industry started to clean up it's act a bit in response to an increased public concern with air quality.   The waste gas from the furnace stack couldn't be run through the existing gas cleaning complex beyond the dust catcher as it would clog up the system.  The gas came out of the furnace much hotter, the dust was a different consistency, and it had a much higher moisture content due to all the cooling water sprayed on it.  The pre-1950's approach to this problem was simple - don't bother trying to clean and reuse the gas - just open up the bleeders on the furnace uptake - problem solved.
USS Duquesne blast furnace #3 in ferro production prior to adding a ferro gas cleaning plant
A temporary solution was to run the gas through the dust catcher and then up a very tall bleeder stack.  This would disperse the waste gas, and associated particulates over a much larger area to make it less noticeable.   By 1953 USS had addressed this problem at Duquesne with the addition of a ferro specific gas cleaning facility.  I will be attempting to model a representative example of this cleaning plant.

DIFFERENCES THAT AFFECT MODELING AND OPERATIONS -

coke - twice as much used in the process - change quantities of carloads delivered
gas - dirty and can't be cleaned in normal loop - tee the dirty gas main after the dust catcher and install goggle valves - one trunk to the normal iron production gas cleaning equipment, and the other to the ferro gas cleaning plant
product - refractory lined gondolas used - need to model a processing plant for the ferro product





Sunday, May 6, 2012

TREADWELL 200 TON BOTTLE CAR - Part 3

Need to keep this short, but I'll post some pictures of today's progress and then follow up with some more info in my next post.
Adding rivet decals - tricky operation - tips in the next post



Trunnion supports and platform,  Truck bolsters/platform seen just to right