COKE OVENS - Part 8

The collecting main at Thomas was not the round pipe that you see on the Walthers kit or in Dean Freytag's version, but was instead a squarish 7 sided apparatus.  I knew that building it would be interesting so I put some thought into first.   My original thought was to build it out of sheet styrene, but I was concerned with the tendency of that material to warp, especially longish constructions like the main.  As I have before, I turned to Medium Density Fiberboard, or MDF for short.   I used 1/2" material and cut two pieces and glued them together.  I needed to make two of the cuts to form the angular bottom of the main after the glue up was finished.

glue up in progress
Getting there, you can see the complex profile

A few doses of automotive primer, sanding and light filling, gave me a pretty good looking collecting main.  To attach it to the ovens I drilled a series of 1/8" holes in the bottom of the main using a Dremel drill press with the stop set for depth.  I was then able to insert 1/8" styrene rod into the holes.  3/16" H-columns were glued to the bottom of the rods and then these were glued to .125x.500 styrene.  The styrene strip fit into a groove on the back of the oven and was secured with epoxy.
Adding the legs - you can see the start of my larry car in background



Sunday, July 22, 2012

COKE OVENS - Part 7

The casting campaign finished up late last week.  I ended up casting about 80 doors - 65 for the ovens, six for the spare door storage area, and the rest had significant defects and where unusable.
They go on and on and on.....
I also kitbashed a Walthers' Glacial Gravel kit for the coke crushing, screening, and loading building.  I basically streamlined the structure to sit over two tracks, not building about half of the structure.  This sounds easier than it is - the kit has the intersecting rooflines molded into the kit walls, with the area under the roof profile, smooth plastic.  I had to cut out these sections and carefully splice in pieces from the unused walls at the molded metal siding seams.  I also found a way to retain the small loading bins from my previous coke works, themselves from a Walthers' New River Mining kit, but modified with stairs,....etc...
Ignore the too blue sky and crappy back drop - soon to be changed and the rest of the coal/coke yard scenicd
I've seen some very interesting quench towers but don't really have enough information, and maybe space too, to build them, so I once again turned to the Thomas Coke drawings and photos for inspiration.  The Thomas Coke quench tower is a pretty interesting structure in it's own right with an external steel framework and corrugated panels on the inside.  I was on a roll with this structure, building most of it while watching True Blood and then Breaking Bad this evening, but alas, ran out of 5/32" I-beams.  It's a basic structure - 3/16 vertical H-Columns, 5/32 horizontal I-girders, .040x.040 diagonal bracing, and .125 strip reinforcing on the insides.  The "foundation" was .080x.250 strip.
Needs more I-beams and some plumbing

Tuesday, July 17, 2012

BY-PRODUCTS PLANT - Part 29

With my new found elbow room for my by-products plant I'm able to add a few more structures, namely a Benzol plant and also, the subject of this post, an Ammonium Sulfate storage building.  I found a photo of an unique building serving this purpose on the HAER site and set about to build a very compressed version of it.  I'm not sure of the name of the coke works, but will include this information in a future post.  It is in Alabama and isn't Thomas Coke.  It has some interesting features that include a coal bunker filled directly by railcars via a very elevated spur.  Also, the quench tower is perpendicular to the oven battery and the associated quench car track follows a 180 degree curve.   I started with the actual storage building - there is also a tower to elevate the product and a connecting horizontal conveyor.
Building the Core
This building sort of looks like a Mayan pyramid or something, but allows for bulk storage of the ammonium sulfate by-product.  The base is .060 styrene and the internal formers are .040 sheet styrene.  The structure is sheathed in .040 styrene with a JTT corrugated metal plastic sheet glued on the large roof.  The concrete buttresses are made from .040 sheet and .020 strip.

Corrugated material on one side so far.  Corrugations are a little heavier than scale but will probably look fine once it's all built


Sunday, July 15, 2012

COKE OVENS - Part 6

The resin cast doors have been going well.  I ultimately made six doors and then made a new mold of these.  I can cast seven doors at a time now - the 6 plus one in the single mold.

six oven door mold

Here are the first twenty or so glued in place


I already have more ovens than my former coke works....


Thursday, July 12, 2012

COKE OVENS - Part 5

I have about 85% of the oven front structure complete and all the brickwork is in place on the top deck of the coke ovens.  For the doors themselves I wanted a bit more detail than those found in the Walther's kit, which are basically a copy of the Dean Freytag scratchbuilt coke oven.  My other concern was being able to repeat the door details perfectly over 65 doors.  And the time involved was another worry.  Resin cast doors mostly solve all these problems so I made a master. I roughly based the door on the Kopple type found at Thomas Coke, but did use some thicker sections and also left out some details that would have been too fine.  Here is the master

The mold,....

And the castings


These aren't glued in, just sitting there for effect.  Ultimately they would be centered better and also I will add a linkage rod of brass wire or plastic rod between the two locking mechanisms.

Casting 65 of these plus the six spare doors would take about 15 nights at a rate of 5 per.   Instead I've cast five doors and will clean them up well and make a mold of these five.  That way I can cast five at a time and move along at a more rapid pace.  

Sunday, July 8, 2012

COKE OVENS - Part 4

Some more work on coal bunker....

Finish adding vertical .060x.100 strips to lower sides of bunker and also added detail to the  large  horizontal beams that support the bunker.  Also did some more work on the roof panels and also scribed them.

On the ovens I started to add the vertical steel framing between each oven.  I'm using HO scale 6x8 styrene strips and .015x.100  strips for the face to give the appearance of a steel I beam partially imbedded in the masonry structure.   The space between will be filled with a resin cast door, once I make the master and start casting the doors.  I'll need the 65 doors for the ovens plus 5 or 6 more as there was spare door storage along the guide car track, just to the left of the ovens.


Saturday, July 7, 2012

COKE OVENS - Part 3

We left off with the roof structure of the coal bunker.   Continuing, I added the substructure for the body of the bunker using .040 styrene and plenty of bracing.  The end walls were pretty straightforward but the side walls have an lower section that cants in on a slight angle.

Next I added the legs using 5/16" I-bean material from Plastruct.  I always use Plastruct over Evergreen shapes when the structural member will be carrying weight (the bunker) .  Evergreen are finer in their appearance but the slightly thicker Plastruct will not deform under a load.  I added some minimal cross bracing for now in the form of 3/16" I-beams.

The ribbing on the sides were made from .060x.100 strip styrene.  Additionally, large steel beams were made from sheet styrene and .040x.156 strip and added to the lower angled sections.  Finally, the roof was added using Evergreen .040 corrugated siding.