Tuesday, April 7, 2009

PIG CASTER Part 8

Not much to report in the way of progress on this model or any others for that matter.  I spent most of the weekend down in Maryland getting my sailboat ready for launching later this week.   I used to think model railroading was a cheaper hobby than boating, but lately they are leveling out.   
It's a little off topic but I'm posting a picture of my b
oat - it is a 28' sloop manufactured by Cal-Jensen in 1972.  It weights about 5300lbs, which is relatively light for a sailboat of that size.  About 2000lbs of that is in the keel (the big fin on the bottom) which is a solid lead casting.  It is attached to the boat by 3/4" stainless bolts, and hopefully never falls off.  The primary propulsion is of course the two sails, with an auxiliary engine.  The engine was originally a 9 hp two cylinder Volvo diesel.  In the event of a complete failure of the electrical system, this engine could still be started using a hand crank.  Unfortunately, the galvanized fuel tank behind the engine was leaking and the only way to take it out was to remove the engine.  Given the age of the engine and the fact that it had been cooled by salt water for 35 years I decided not to reinstall it and now use a 9.9h
p four stroke outboard motor when needed.  I have kept the boat in Avalon, near Cape May, NJ for the past 8 years and sailed it primarily in the Atlantic Ocean, up the coast to New England and over to the Chesapeake.  In November I sailed it over to Maryland where I will keep it for this summer, sailing out of the Sassafrass River onto the Chesapeake Bay.  Yes - I will be sailing it over to Baltimore for some waterfront viewing of Sparrows Point.  
Back to the pig casting machine - I did cut a hole in the layout for the subterranean conveyor assembly.  You can see how it will look in place and also it will allow me to make some precise
 measurements for the upper building.  I will have to deviate from Mike Rabbit's plans in the construction of this structure as my trackwork is more compact than what was shown on the plans.  I will have to extend the structure so I can place supports without interfering with the trains, and it will have to span both tracks.  

Saturday, April 4, 2009

BOILER HOUSE - Part 1





As I explained in the previous blog, I'm now using a combination of two prototypes for my B-Furnace.  In the process of researching the historical photos showing Central Furnaces in Cleveland, I took a liking to the boiler house at this furnace.   There is only one end view of the actual building and a few shots from far away that just show the unique stack arrangement.  It appears that this structure was built sometime between 1940 and the mid-1950s.  
It is basically a large corrugated steel building.  It should be a simple project if I can figure out the window arrangement on the side I can't see.   To both save money and prevent spending a lot of time on interior bracing, I've opted to build the core of the building from 1/4" MDF.  I will simply laminate Evergreen corrugated styrene to the building.  Any window or door openings will be made quickly with an oversized drill and then the styrene will be cut to the precise size.  I used the picture I had to scale off dimensions the best I could.   - I figured about 84' wide and the length I just did by eye and was a complete guess.  I spent about 20 minutes cutting out the pieces - one foundation, two end walls, two side walls, and four roofs.  I also cut out a 3/4" piece of MDF to use as an internal brace and also as a platform to rest the stacks on. 
The building was assembled using yellow wood glue and blue painters tape.   The roofs are what we term in construction a 6/12 pitch - for every 12 inches horizontally there is a 6 inch vertical rise.  This works out to be about a 27 degree angle - I cut this angle on the side wall top, the edge of the lower roofs, and both edges of the top roofs.  I do this so I had nice tight glue lines that will be strong enough to maintain the shape of the structure.  As far as cost - the MDF was bought in a 2'x4' sheet from Home Depot for about $5 - I used only a little over half for this building, a bit more for the casthouse floor for b-furnace and I still have a bit left over.

Friday, April 3, 2009

B-FURNACE Part 5


You can make yourself crazy trying to refine a plan to every last detail before starting to build.  This is something I deal with frequently in my work and in my model railroading.  For a number of years I owned a woodworking/cabinet shop.  I'd find myself in situations where I could spend 20 hours making working drawings of something we were going to build, or I could make some quick sketches and start building, keeping things organized more in my head than on paper.  In most cases I did the later - just start cutting wood and get building, which, after all was the reason I chose that profession.   Does that work for everyone? - no.  Did I make mistakes and have to rebuild things? - yes, but in the long run I probably never spent as much time correcting mistakes as it would have taken to prepare detailed plans.   And again, I didn't aspire to be a draftsman, but rather, a woodworker.  Now a smart guy, which I am far from, would have hired a draftsman/cad person, but I'm stubborn too, which is a story for another time.  
The same behavior applies to my model railroading.  I've become an expert at pulling up track and relocating it.    Thankfully, I don't hand-lay track anymore.  When it comes to the steel mill, well, you can probably see if you have been following this blog, how I change my plans a bit.  I'm a night person, always have been.  My best work and thoughts usually occur after midnight.  I frequently find myself standing down in the basement in my pjs staring at the trackwork, the layout of buildings,...etc., and then the brain finally kicks in after being on standby most of the day, and I spend the next two hours or more running between my office computer/walthers catalog, and the layou
t with a HO ruler in my hand.   Well I've had a few of those moments lately, usually after finding some new HAER drawings or photos.  There were a few hours spent last night trying to figure out a way to fit a third blast furnace along the high line - can't be done without looking like it was jammed in there.  There is room for the furnace, just not room for the requisite trackwork for the casthouse and dustcatcher.   
So, after this long-winded intro, what's up?    First - my B-Furnace as morphed from a loose representation of USS Duquesne B-Furnace to an amalgamation of that furnace and, my new favorite of the moment, USS Central Furnaces (Cleveland) D-Furnace.   They both have similar top-works, and I will keep the single skip car and hoist house arrangement from Duquesne and use the stove layout, casthouse, and dust catcher (which is very unique) from Central Furnaces. The photo is of the real D-Furnace - notice the stove arrangement - three, then a really interesting stack, then the skip hoist, and then a shorter fourth stove.  Also, the interesting dust catcher and piping arrangement.  
 
I had a preliminary styrofoam base I was using for the casthouse.  This was ditched in favor of an MDF foundation.  MDF is a wood product - basically a very dense particle board.  It is incredibly stable.  I used it in the cabinet shop for raised pane
ls that were to be painted.  It is also cheap and best of all, the cut edges can be sanded and finished just like the other surfaces, so, for foundations, which is where I am using them here - I can seal the mdf and then paint it aged concrete without putting a styrene veneer on the edges.    Now at this point, some of you are going, here he goes with the wood again - well with all the problems I have been having with styrene lately, I almost feel that wood is the only thing I can trust to stay flat for larger surfaces.  I am getting some very minor deflection on the foundation for A-Furnace, which is sheet styrene and styrofoam.  The sheets were either .080 or .125, and there is a slight curve to the overhang for the storeroom, not enough to cause problems yet, but just enough to bother me.   I did use MDF for the base of the A-Furnace gas cleaner framework foundation and its still dead flat.  
The casthouse footprint is 60'x whatever 17" works out to be (the length of the sheet of paper I drew the base out on)   I used three pieces of 3/4" MDF to form the solid foundation under the furnaces and then a single piece of 1/4" MDF to represent the elevated casthouse floor.   The stove foundation is 3/4" MDF.

Tuesday, March 31, 2009

PIG CASTER Part 7



I made my mind up to go for broke on the pig casting machine - after heating and reclamping and then glueing on braces and the legs of the mold belt, I figured I might as well mount it to the lower building as the foundation construction, made out of .080 styrene was going to go a long way in bracing about half the belt.  With all this done, the belt is pretty straight, the only problem being the upper 25% - I might have to weight down the upper structure or glue it down to get this slight warpage out.   It's late and I'm tired so pictures will suffice for the results.  If you look real close you will see that I'm putting a small disk punched from .020 styrene at the joint between every two molds.  It's a bit tedious - have about half done.

Sunday, March 29, 2009

A-FURNACE PART 3


Not really reporting much progress on this furnace - actually in a way I'm loosing ground.  I've decided to give the almost finished stoves to B-Furnace.   The reasons? - Primarily scale.  I've been trying to stay as close to the prototype on A-Furnace as possible (The prototype being Bethlehem Steel A-Furnace).  One thing that has been bugging me has been that the Rix Tanks that I used for the stove bodies scale out to around 24', however, the prototype stoves were around 21'-22'.   Now you are saying - 2', give me a break, however, when you layout the stoves on their foundations, all other issues start to creep up.  These structures were very close together in the prototype, so when you add 2' to each, you need to re-space everything, and then you start running into clearance problems in an area that was already tight.  Another problem was appearance.  I had started working on a test mock-up for the stacks - my plan is to finish the top of the stoves with a .060 styrene disk and then glue in the center the base of the stack with a hole drilled for the 5/8" pipe.  Then I will cut a hole in the vac-formed top and slide it over the whole thing.   This would make for a pretty sturdy stack which I figure sooner or later might get bumped.   See picture of assembly.  When I temporary placed this on the finished stove body, it just looked a little off - not like the pictures I have of the prototype - it's amazing what a difference 2' will make.  
So what's the alternative - Plastruct tubing?  well, I like the rivet detail on the Rix tanks.  Then in an email correspondence with Vince Altiere he tells me he used 5 pieces to form the stove instead of the 6 the kit calls for.   Thankfully someone was thinking a bit creatively.   So I try it - it works great - you just need to let the glue set up on the five sections before closing the ring.   This assembly scales out at around 20' or so - looks much more appropriate for stoves that were built in the 1920's.   So I've been going back and forth about scrapping the whole mess - using it for the B-Furnace stoves,...etc.  - I finally decide to shift these stoves to B-Furnace and start over on the A-Furnace stoves - then I start thinking some more - about hitting that 22' dead on - so tonight I tried 5 sections plus one half a section - scales to a perfect 22'.  I loose the rivet detail on the seam with the half piece, but I'll position the stoves so that the cut pieces face each other and aren't that visible.  It's a bit of work, but I think it will be worth it.    Just to check on the 24' stoves for B-Furnace I pulled out my 1930 copy of the "Directory of the Iron and Steel Works of the United States and Can
ada"    Just under Bethlehem Steel - the Bethlehem plant had all 22' diameter stoves, the Steelton Plant had a mix with some 24' and 22'.  Sparrows point had 20' and 22' stoves.  So all three variations of the Rix tank - 5 , 5.5, and 6 sections will give you prototypically correct stoves.    

B-FURNACE Part 4


Once again work is progressing faster on B-Furnace than A.  I took a break from the pig casting machine problems and did just a little work on B-Furnace.   Started to build the stairs in the top works.  I've decided to build most of the railings throughout both structures from scratch after seeing Jeff Borne's DVD "Superdetailing a Walthers Blast Furnace Part 2"  - I skipped part 1 and went straight to part 2 as it had more things that interested me.  At first I thought this might be difficult, but a pair of tweezers and some glue and a steady hand make it relatively simple.  It's actually fairly relaxing.   I've also decided to use the mostly built A-Furnace stoves for B-Furnace instead.  I'll talk more about the reasons for this in the following A-Furnace blog.  The picture shows them in temporary place next to the furnace.  I will need to fabricate a foundation for them.

Thursday, March 26, 2009

PIG CASTER Part 6


Thanks to all those who have suggested solutions for the warpage problems I've been having with the Pig Casting Machine's mold conveyor belt.  Especially thanks to the yahoo steel group.  
I still haven't quite figured out what is causing the problems, although I have been having many similar problems with other structures.  A big problem I think is recreating the prototype using beam sizes from the original plans.  These beams are small and very flexible - I might need to start to compromise a bit on sticking to scale in return for a more solid structure.   What I have learned - 
  • You can use heat, despite many warnings on this, to readjust the assembly.  I used an electric stovetop burner -  set on high and I moved the assembly back and forth over the heat with the bow facing up.  Doing this allowed the weight of the structure to sag the center - I quickly put the assembly on a flat surface and weighted down
  • Heat is only a temporary fix - eventually the warpage started to return.
The heating did allow me to flatten the structure enough to join the upper and lower belt assemblies using clamps, spacers,...etc.  See the picture for the details.  I'm hoping that by the time I add all the bracing,...etc.  the structure will be rigid enough to hold its own shape.