Wednesday, March 25, 2009

TRACK PLAN Part 1 - Lower Works

While I work out my styrene issues on the pig caster I took a break and finally put together a primitive track plan of The Lower Works.    I apologize in advance for the poor quality, but I have no drawing program that I have mastered enough to accomplish a decent result in a short time.  

The red lines are tracks in the mill, the blue lines represent the mainline, which just briefly pass through the mill.  As I have said before I have a small basement so this should serve to show what can be done in a small space - Most of the track shown, other than the high-line is installed.  Most of the buildings are either under construction or in the planning phase.  This is just a portion of the layout - in addition to the main snaking around the main room in the basement, I also have a small port section, a long narrow section with the coke works and later, some non-steel industry.  A third addition,  3'x14' has yet to be started.  Originally this was supposed to be a large yard with a passenger terminal and city.   I am going back and forth on this right now as to whether to just add some steel mill structures -either partially or entirely.  At the minimum, an EAF (electric arc furnace) will be located there.  

Back to the Lower Works - As of now the following structures are under construction or planned - 
  • Blast Furnace A - Replica of Bethlehem Steel A-Furnace - Scratchbuilt - under construction
  • Blast Furnace B - Semi-replica of USS Duquesne #3 Furnace (also will produce ferro-manganese - Scratchbuilt - under construction
  • Pig Casting Machine - Single Strand - Scratchbuilt - under construction
  • Ore Yard - Modified Walther bridge crane - under construction
  •  Rolling Mill - Walthers Kit with Pravik Resin castings and scratchbuilt rolling mill interior details
  • Heat Treatment #3 - Replica of Beth Steel Heat Treatment #3 (the High House or Gun Shop) - Scratchbuilt - planning phase
  • Blowing Engine House - waiting for new walther's kit to evaluate - maybe scratchbuild
  • Boiler House - either kitbash or using modular sections
  • Other structures - the will be numerous other small structures.

Sunday, March 22, 2009

PIG CASTER Part 5


Work continues on the mold conveyor belt section of my pig casting machine.  It has been extremely tedious work, building each idler wheel assembly and each pig mold.  I also have been having problems with the styrene warping.  Most of the basic framework was relatively flat after being built, however, after I glued on the separately assembled pig mold belt, the entire assembly curved badly - to the point I am worried about getting it all flat ultimately when I assemble the return belt section to the upper belt section.  If anyone has experienced this and dealt with it successfully I would like to hear all suggestions.  I might be hoping for too much that the assembly will square itself upon final glue up.   The picture shows the upper belt assembly - rear on an angle, and the return belt assembly, flat and weighted down by glue bottles and other things.  The pig molds are made from 1/8" Plastruct deep channels with .030x.100 sides - I will go back later and add small round punch outs at the joint between every two molds.

Monday, March 16, 2009

TOOLS AND TECHNIQUES - Part 1




CUTTING TUBING FOR REALISTIC STEEL MILL GAS PIPING
This will apply to basically any type of tubing, however, I have mostly been using wood dowels for fabricating bends and tees.  Plastic can be cut using the same saw, but the blade should be changed to a plastic cutting blade. 
Creating these parts from wood dowels isn't hard.  You just need to make a jig to hold the piping to be cut - and - you need to establish a reference line that you can use to align the piece in the saw and drill, and later, use these lines while gluing up the pieces.  
The Jig -


As you have seen in some of my earlier posts,
I don't believe in spending a lot of time or money building jigs or tools.  The jig for piping will wear out pretty quickly.  You will need to make one for each size pipe you wish to cut. 

  The jig is made from a scrap of 3/4" plywood and two hardwood fences -  The rear fence is about 1"x1"x the length of the jig (which is about 12" in this case but it doesn't really matter)   The inside fence needs to be exactly half the diameter of the tubing in thickness, in this case, 3/8" x 1".  

To assemble the jig - first, glue the rear fence in place along the edge of the board, use spring clamps to hold.   Then, using a scrap dowel as a gauge, install the inner fence using glue and spring clamps.  I don't use any metal fasteners, as they might damage the blade or drill bit.  

Reference Line - this is a simple thing, but important in terms of creating consistently sized parts and for aligning these parts while glueing them together.  Basically, just put the dowel in the jig and draw a pencil line across it,  using the inside fence as a guide.  Also mark the rear fence of the jig using a ruler, again at the half way mark. Rotate the dowel until the line across it lines up with the mark on the rear fence, and then drag a pencil across the front fence - at this point you should have two lines, directly on either side of the tube.  Whenever you cut or drill, always align one of these lines with the front fence.   When you glue up the tubing, align the reference marks and you will end up with no twists in the elbow

B-FURNACE Part 3


I've been making more progress with B-Furnace, primarily in the top works department.  

I added reducers to the uptakes to go from the 3/4" Plastruct tubing to 5/8".  I also added the two
 upper platforms and some of the structural steel framework.   This furnace, based on US Steel's Dusquesne Works #3 had a single skip car.  I've decided to keep this configuration to make things interesting.  The sheave is a Grandt Line O-Scale mine sheave that I had lying around for an 0n30 project.  It scales in HO to almost a perfect match for the prototype.  I also started the bell assembly - the bell was turned from a block of mahogany I had lying around and the receiving hopper was built from .040 and 0.30 styrene.   I also started to build the downcomers.  

You will notice that I am using both Plastruct tubing and wooden dowels to represent the piping.   There was some discussion at the last Steel Mill Modelers Meet about using wood in models and problems with styrene.  Styrene can be frustrating sometimes, especially when using the smaller structural shapes.  
While the Plastruct tubing isn't styrene and seems to be a little more stable than styrene, there are two problems - it is relatively expensive, especially given all the piping I will eventually have, and more importantly the elbows they sell don't represent prototype practices.  Remember, we are talking about 8' diameter pipes in some cases - not something you can pick up an elbow for at the plumbing supply house.  The turns of these large pipes were done in segments, welded together.  I'm using 15 degree angles for my segments, which look about right.   

Some other benefits to using wood are that you can use wood glue to stick the pieces together - this glue is super strong once dry and the joints are unlikely to fail; and wood is easy to fill and sand to ease any sharp edges.    For a $2 wood dowel you can fabricate about $30 of Plastruct parts.    Of course there are cons too - namely the weight of the material; the bond between the plastic and wood; more prep for painting (ie sealing and filling); and you can't really use it to represent any type of stack that you can see the top of.  You will see me mixing and matching materials.  The second photo shows glued up, but not sanded piping segments.    A word of caution - it's not as easy as it might appear to make these wood parts, but there are a few simple jigs and techniques that will make it simpler.  I'll cover these in a future blog - TOOLS AND TECHNIQUES



Sunday, March 15, 2009

PIG CASTER Part 4



Shifted gears a bit on the pig casting machine and began work on the actual machine part of the complex - I'll be back working on the lower building soon.   Essentially a pig casting machine is a conveyor belt of pig molds - hot iron is poured into these moving molds on the low end and, with the help of water sprays, the pig sets and is dumped out of the mold and into a waiting gondola on the high end.  The electric motor and drive system is on the high end.   

 The conveyor is primarily a bunch of I beams and angles with rollers for the pig mold belt and then the molds themselves.  Originally I'd been thinking of using some sort of large scale corrugated siding to represent the molds, however, this would have been a poor representation.  I also had thought of making a master and casting the individual molds and rollers in either metal or resin - this would have taken forever to make tha
t many castings.  In the meantime I came across Plastruct U-channel structural shapes. These are only manufactured in a few sizes but they would solve both my problems - the smaller size (3/32) I used for the brackets for the rollers - the rollers themselves are made from .040 styrene using a punch.  The larger U-channel, (1/8) will be used for the actual pig molds.  I spaced the rollers per Mike Rabbit's plans on 1/8" H-columns with 5/32 I Beam cross members.  There are walkways on both sides made from .030 styrene.   Next - the pig molds and links, the lower return belt, and the supports and roof for this structure.  


Wednesday, March 11, 2009

PIG CASTER Part 3


A little more work on the hot iron end of the pig casting machine.  I've added some additional diagonal bracing, mostly .080 or .060 Evergreen angle, the crane rails, and some of the corrugated roofing/siding.  I intend on leaving the one wall of the building without siding  so the interior of the structure is visible.   I still have some diagonal bracing above the crane rail to do and also the framing for the structure enclosing the actual pig machine.  

My son Jimmy turns 15 tomorrow (actually today, it's past midnight) and I have been working on a present for him the past few nights so the steel mill structures were put on hold a bit.  Besides model railroading, one of his other hobbies is wargaming.  Specifically he plays a game called Warhammer 40,000.  It is science fiction themed wargame that uses 25mm scale miniatures (that is the equivalent of S-Scale).   There are hundreds of commercially available miniatures for building your army - all either in plastic or metal, and all unpainted.  Besides playing the game it takes a lot of time to build and paint your army.  Jimmy plays with an Ork Army.  The Orks are large ugly green creatures that rely on numbers and brute strength.  They are not very intelligent and thus have no technology of their own, but are masters at taking captured machines and other junk and turning them into weapons.  The results are usually not very sleek machines.  This model I build for him is of an Ork Dreadnaught - basically a large armored fighting suit.  I didn't use any plans to build this but just based it on some pictures I'd seen and free lanced things.  Ork machines don't come off an assembly line so there is really no standard, which makes things fun and easy.  It's mostly made of .060 and.040 styrene with some Evergreen structural shapes.  The only commercial parts are two pieces from the Walther's industrial tank kit.  It was a lot of fun to build and a nice break from building things off plans.  I'm giving it to him unpainted - he will finish it and I'll post another picture.  

 

Sunday, March 8, 2009

PIG CASTER Part 2


I've made a little bit of progress on the pig casting machine.   The machine is based on a prototype machine from Chester, PA, although I am making a few minor changes.  I am using plans that I purchased from Mike Rabbit.    Although its a relatively small and simple structure, the framing is taking a bit of time - the main support posts are 5/16 Evergreen I-Beams that have been modified for the crane on the one end.  There are also an additional 4 styrene strips per piece.   The crane beam is also made out of 5/16 Evergreen material.  The roof trusses are made from .060 and .080 angles with .020 gusset plates - there are 21 individual pieces in each truss.  

 The next step is to finish this structure - I still need to: finish the post supports,  add more diagonal bracing, add crane rails, wires, and bumpers, build a control booth, build the well for the actually casting machine, and install siding on the building.

Also left is the entire upper structure, the crane, and the casting machine.