Thursday, March 5, 2009

RESEARCH Part 2




Some more pictures from a recent research trip.  
The bridges of Linden, NJ -  two neat little lift bridges on the Elizabeth River between Linden and Elizabeth, NJ -  not railroad structures but would still make nifty little models, especially the bascule bridge.  Believe it or not the bascule bridge is still manned - it appears the only boat traffic are a half dozen small motor boats just west of this bridge (the bascule) - the remainder of the river is devoid of any sort of marine facilities.    The Elizabeth River starts just to the east of the Bascule bridge at the Arthur Kill.  (The Arthur Kill runs between Raritan Bay and Newark Bay with the east shore being Staten Island and the west shore, New Jersey.  The main channel into New York harbor actually parallels the Arthur Kill, but on the eastern side of Staten Island.)    
The other photo is of a I have no clue locomotive.  It was taken at a junkyard just south of the Bascule Bridge in the Bayway section of Linden, NJ .   The hood looks sort of GE 44 tonner but Im not sure about the headlamps.  Also the trucks?  Someone said maybe a military 44 tonner that has been modified - help.  Please email me if you know.  If someone made a model version it would be right at home in a model steel mill

Tuesday, March 3, 2009

COKE WORKS - Part 1



The coke works that will supply fuel to my furnaces is located on an older section of the layout.  Because of space constraints it will only be partially modeled.  I'm using a kitbashed New River Mining kit as the basis for the coal/coke crusing/prep building, a Walther's Gas Works for the coke ovens, a Vulcan Manufacturing kit for the Ammonia Sulfate/byproducts building, and a Walther's gas holder kit.  Most are modeled and are awaiting paint.   I am also scratchbuilding a number of details.   

The first photo shows my guide car, built out of styrene per plans and instructions published in Model Railroader Magazine as part of an article by Dean Freytag.   I am only modeling the one side of the coke ovens where the coke comes out - so I will need to build the guide car, a door car, a quench car, and the larry car for the top of the ovens.  I do not need to build the pusher as it won't be visible anyway.   I thought maybe Walthers would issue the quench car that is part of the new coke works kit separately, but it doesn't appear at this time that will happen so I plan on building it on a flat car body, again per Dean Freytag's article.  

The other photo shows the ammonium sulphate building which would have been part of any by-products recovery at the prototype.  I am lighting the interiors of most of my buildings so I wanted some interior  details.  As they are only going to be barely visible - nothing perfect, just representative of the overall flavor of what would be going on inside.  In this case I used parts from an old Vollmer Oil Refinery kit.


DETAILS - Part 1

Just received a scrap bucket (left) and teaming ladle from Brandon Wehe.  They are very nice resin castings with some plastic details added.  I plan on purchasing many more of these items to detail the electric furnace and open hearths.   Included with the order were some very helpful sheets on detailing these items, which I plan to do in the near future, so stay tuned for more on these.   

Sunday, March 1, 2009

PIG CASTER Part 1



Began work on my pig casting machine today.  This will be located behind the blast furnaces and will be a destination for the hot iron from them.  The first photo shows the pig caster at Bethlehem Steel.  For those not familiar with these machines, they are basically a conveyer belt system of molds.  The hot iron is poured into the molds on the low end and as the belt makes it way up to the high end, the iron cools, sometimes with the help of water sprays, and as the belt turns, the pig falls out and down a chute into a gondola usually.   The machines in the pictures are what is know as double-strands - in that there are two separate mold belts.  Actually this facility was two double strands, so four belts of pig molds could be running at once.  At some mills, especially merchant iron plants, all the iron was cast into pigs using these machines, which is some cases were directly connected to the cast house so the hot iron didn't need to be transported in railcars.  At other mills, like Bethlehem the machines were used as needed.  If there was a need and market for pig iron, and sometimes because there was no need for all the iron coming out of the furnaces - excess iron was cast into pigs and stored for sale or use later.

My machine will represent a small, single strand facility.  It is based on a prototype that was in I believe Chester, PA.  I purchased a set of plans from Mike Rabbit that he drew of this facility.  The prototype was attached to the cast house, however, I am making mine a stand alone facility.  I am trying to stay true to the plans as much as possible.

I am starting with the construction of the low end of the caster - I've inverted the arrangement from the plans and simplified and modified the foundation just a slight bit.  It is built on a base of .060 styrene with balsa wood for the foundation.  The main supports, which I need to build 6 (four are shown) are built from 5/16 styrene I-Beams with .020 styrene strips added to the one flange to model the arrangement at the prototype.  The upper part of the beam is cut back to allow for the crane supports.  

The roof truss, one shown out of five I need to model is built using .080 and .060 angle with .020 webbing.  The .080 is a little larger than I would have liked but I was concerned about going smaller and having the plastic deform on me.

PIG CASTER Part 1

Saturday, February 28, 2009

RESEARCH Part 1




I'm entitling this section research.  I try to keep a camera in my truck and photograph prototypes that will help with my modeling.   Before digital photography I used to be pretty conservative with what I wasted film on - now with digital images I try to take as much as I can, although I find myself in old habits and have to actively try to remember just to take everything.  
At last Septembers Steel Mill Modelers Meet there were two presentations related to detailing steel mills - one by E. Craig called "Figures & Period Detailing Ideas", and the other by John Best, "Steel Mill Details".  Both were excellent and sort of opened my eyes to the importance of detailing structures in order to add that layer of realism.  So in addition to photographing the distillation tower, or coal unloader, or blast furnaces,...etc.  I also photograph the electrical substation, the bridge carrying piping across the road, the roof ventilators,...etc.   
The plan for "RESEARCH" themed blogs is to just post a picture or two or three and brief comments.  It will also allow me to keep blogging on a regular basis, even when I don't have time to write about a more complicated modeling theme.  Feel free to copy and use the photos however need to augment your  modeling.   
PART 1 - Just took a drive up to northern New Jersey and shot some pictures along the shore of the Arthur Kill between Port Reading in the south and into Newark Bay and onto the Passaic River in Newark.  This is the heart of the New Jersey petrochemical industry, but also home to many other manufacturers.  This is the image that many people have of  New Jersey.  

Top Left - Hess Oil Refinery , Woodbridge, NJ
Top Right - Singer Sewing Machine Factory, Elizabeth, NJ - Subdivided and used by many different tenants today.  This building is huge and was only one part of the complex that made this famous sewing machine.  Just behind this structure were the Central Railroad of New Jersey's shops and a large yard.  Today there is a small intermodal yard and the "Largest Outlet Mall" in the state.  If you are a railfan, the mall parking lot runs right along the yard offering excellent and legal places to photograph from, -  wife might like the mall.
Upper Right - Unknown, Linden, NJ - interesting looking structure with both rail and water materials transport facilities.  Used by a few different warehousing companies now.
 

Friday, February 27, 2009

Signs Part 1


I find I'm already using up titles for each blog too fast and its not worth the time to try to come up with something new each time.  So to keep it simple, I will just use "Part #" after each title - Like Blast Furnace A - Part 4 or Coke Works - Part 7, ...etc. 
This blog is about signage.  A couple of things I've been simultaneously been working on, all in the Port section of my layout - a sign for the end of the coal dock;  a sign for the top of a cement distributor; and finally a Miller Engineering animated billboard kit for the top of a backdrop building.  

On the right you can see the attempt at a coal dock sign - basically a Lackawanna logo on a piece of styrene.  I found the image online and adjusted the print size to fit and glued it to a piece of .030 styrene.  I still need to paint the back and glue it to the end of the coal dock structure.  I might also arrange some sort of lighting for it.  

Behind the Lackawanna sign you can see my Atlas sign.  I scratchbuilt this - the letters are .020 styrene, cut from sheets using letters printed out using Word.    The vertical and diagonal supports are .125 Evergreen I beams, with .080 Evergreen Channels as horizontals.  The diagonal bracing is .060 Evergreen angle.  It is shown with a coat of primer.  The letters will be painted red and the framework probably grimy black.   The prototype for this sign, and the facility under it is located in Newark, NJ on the Passaic River.   The prototype sign was actually neon and visible from the New Jersey Turnpike.  It is still standing, although not lit at night.   The facility was built by the Atlas Cement Company, later Universal Atlas, to store portland cement for distribution in the New York area.  It received cement via a barge unloading facility on the Passaic from I believe the Atlas plant in Hudson, NY.   It, as with the Walthers' structure, has a covered rail facility.  With the prototype this may have been for loading railcars for local shipment.   With my structure, railcars would be unloaded, brought from inland facilities.  


Above is a video of a Miller Engineering GE billboard kit.  They are a bit pricey and I wasn't sure how the sign would look as the entire thing is a sheet of plastic.  I am pleased with the look.  It is shown on an unfinished back ground structure kitbashed from a Walthers Hardwood Furniture kit.  So far I've modified the structure,  and added bracing and floors.  I plan on lighting the interior so I need to work a bit more on that and then paint and weather the structure.