Thursday, February 19, 2009

More B-Furnace


Just a quick mid-week update.   I've worked a bit more on B-Furnace.  The platforms around the upper furnace stack are installed.  They are .020 styrene rings with .040 square framing around the outer and inner perimeters.  I still need to add diagonal bracing and railings.  Note that the upper ring is actually a roof, not a platform.  I use a circle cutter I bought at AC Moore to cut these rings - it's fairly effective, even down to less than an inch.
  
I'm on the fence about adding cooling plates and the piping details to the lower furnace shell.  I've been trying to find more information and or pictures of these types of installations.   But in the end, this portion of the furnace probably won't be visible with the cast house hiding it, so it might be hours of modeling time better spent elsewhere.
  
The uptakes are 3/4" Plastruct tubes.  The top platform is .030 styrene with 5/32 Evergreen I-Beams for framing.   If you are wondering about the cantilevered section - this is a bridge to the top of the first stove and the stove walkways.    The hardest part of this assembly was constructing the two segments of the uptakes where they leave the furnace stack.  Most large piping at steel mills has segmented elbows.  When building these you need to alway make sure the you are always joining like angles otherwise one pipe section will be larger than the other. - For example, if you are making a 45 degree bend in one segment - the joining angles would both have to be 22.5 degrees.   In addition to this, you need to also make sure you have a reference point for cutting and joining the pipe, otherwise it will twist.   I draw a line on the side of the pipe and then use a jig in a chop saw that I can keep this line referenced to when cutting.   I cut the pipe sections in a larger 10" Makita sliding miter saw - I use a 10" plastic cutting blade.    I'll blog about some of these tools in the future.   I forget what the exact angles I used were on these uptakes, but at the time I did sketch it out on a scrap piece of wood.    Basically, the first segment has one angle on the furnace end, and a different angle on the other end.  The next segment starts with the same angle, with a 90 de
gree on the other end.  Where the pipe hits the furnace I put some 220 grit sand paper on the actual furnace and sand the pipe end to the contour of the furnace . If you haven't realized it by now, it was easier to put the platform on and then continue the straight uptake sections.  .  

Glues - I use ACC for any of the plastic to wood furnace pieces,  Tenax or Ambroid for styrene to styrene, and Plastruct for the piping as it is actually butyrate, not styrene.  (Evergreen tubing is styrene, but they only make it up to 1/2 inch)

The CNJ loco was my Valentines Day gift from my wife.  It's an Atlas, RS-4/5.     I was thinking of giving her a NYC GP-7, so she had her own locomotive to run on the layout - makes sense to me - but I she liked the jewelry better. 

Sunday, February 15, 2009

B-Furnace continued


One picture didn't make the last post - the finished B-Furnace body - you will note that this time I measured and drew lines for the various platforms while the piece was still in the lathe.  This is very simple to do on a spinning object, while for A-Furnace I will have to go back and take a lot of measurements just to get to the same place.  
I also have sprayed both furnaces with a shellac spray to seal the wood and hopefully keep any movement to a minimum down the road.  It also gives me a non-porous surface for glue to adhere better to.

Blast Furnace B - Start






It's been a bit long since my last post and I apologize for that.  A combination of illness, working a bit too much, and some travel.  I have continued to work on the railroad, but just haven't had the spare time to blog.   I have started construction of B Furnace, which is based on USS Duquesne, Blast Furnace #3.  Shown at right.  I selected this furnace as a basis for my model for two reasons - first, the wealth of HABS/HAER information (drawings, text, and photos) on this facility; and second, this furnace was used to produce ferromanganese.  Ferromanganese production will add a lot to the operation of the railroad as there are different and and or more raw materials handled - more slag - different cars for handling the finished product - and facilities for handling the product.
Using the HABS/HAER drawings I turned the furnace body on a wood lathe from a block of glued-up pine.    With this furnace, B-Furnace, I plan on loosely basing it on Dusquesne #3, giving me more freedom in the construction of the furnace.  For example, at Dusquesne, the cast houses were very small as slag was handled in slag pits.  Originally I was going to replicate this practice, however, it began to seem odd to have one furnace, A-Furnace, using slag ladles and the other using a slag pit.  So I am completely free lancing the cast house, changing its orientation and size to enable tracks on both sides, one for slag, and one for iron
, or ferromanganese.    

I have also continued some work on the gas cleaning structure for A-furnace.  I have added all the frames, the crane rail, and started some work on the stairs and ladders.  I still have a lot to do in terms of cross braces, horizontal beams, platforms, stairs, and two large thermal expansion valves.  

Saturday, January 31, 2009

Vacuum Forming

I've decided to scratch build all my tops, and bottoms in the case of the precipitators,  of any structure built using Rix water tank sections.    These include the stoves for both A and B furnaces, the precipitators (joint facility), and the B-furnace dust catcher.    Vacuum forming, for those not familiar, is basically taking heated plastic and forming it over a male mold, using a vacuum to draw the plastic into the mold while at the same time cooling/setting it.   It's good for larger parts, especially those with gradual curves/slopes.    You can buy a vacuum forming machine - they are slick but expensive, and most are designed to take large sheets of plastic.  For modeling HO scale this would be a waste since the scrap plastic from forming is really unusable as it has been stretched and the thickness at that point is variable and not consistent.    It's quite easy to make your own machine cheaply and easily.   The machine pictured on the right was built in literally 15 minutes.    I took a scrap piece of 3/4" birch plywood and ripped a 7" wide strip on the table saw.  Turn the strip sideways and cut 2 7" squares and then two 3" x 7" strips.  Cut two more 3" strips about 5.5" long.   Using glue and 2" brads (from a brad nailer) nail the four sides together and then nail on the bottom.  Take the top to the drill press and drill small holes about 1" apart or so and maybe 3/16 round.   No need to layout a grid or anything unless you need that perfection - just drill the holes - sand the top on both sides and clean out any plugged holes.  Take the bottom assembly and drill a 1 1/4" hole in one side - this is for a small Shop Vac.  Any vacuum should work so check your hole size first.  Glue and nail on the top.   Almost done - take some more scrap 3/4" plywood and cut two 9"x9" squares .  Then set the distance from the fence to the blade to about 1" or so and plunge cut the centers of the squares out.  If you are unfamiliar with this technique on the table saw it would be safer for you to use a jigsaw - remember it doesn't have to be perfect - the only requirement is that it clears your vacuum machine top and doesn't have an opening bigger than a 8"x8" sheet of styrene.    - You are done and ready to start vacuum forming - all you will need additionally, besides the vacuum is an electric stove or hot plate (heat gun is ok too) and four spring clamps, oh, and most importantly, you need to make your masters.  
In the picture you can see some of the masters I've made - one is for a McClure three-pass stove top, the other is a two-pass stove top, and then the third one is the precipitator top.  I also tried to form a conical reducer for the McClure flue pipe/stack, but the profile was too extreme and I couldn't get decent results.   All these pieces are turned on a small wood lathe from a 4x4 piece of cedar.  The cedar is soft and easy to turn, however, the grain can be a bit open on the ends - I will need to seal and fill these pieces, but before all that work I run a test just 
to check in the size is right,..etc.  

The vacuum forming process is simple - 

  • Cut a 8" square from .030 styrene
  • Clamp the styrene in the frames using a single spring clamp on each side - center the spring clamps as close as possible (this is so you can balance the assemble on two coffee mugs over the burner
  • Set the vacuum machine and vacuum up next to the stove (electric only)  
  • Place two coffee mugs on each side of the burner, turn it on to high
  • Place the mold master in the center of the vacuum form table
  • Take the frame/styrene and place centered over the burner, with two spring clamps resting on the coffee mugs - don't worry that the frame is wood, it won't be on long enough to catch fire
  • As soon as you place the styrene over the burner, turn on the vacuum so you won't be fumbling with this later, unless you have a helper, then have them turn it on just before setting the plastic.
  • Watch the styrene closely - DO NOT LEAVE THE ROOM, and always have a fire extinguisher close by.   Initially the styrene will begin to soften and the middle might first droop just a little and then it will rise a bit unevenly, as the piece begins to droop again, but this time consistently , get ready.  I usually let the plastic droop about 3/4" or so.  At this point pick up the frame and move over the machine and sort of just place the hot plastic squarely over the table top and - poof - the piece is instantly formed.  
  • Let the vacuum run for 15 seconds or so - this will cool the plastic and harden it
  • Turn off the vacuum
  • Unclamp the frame and remove the master.  
Now that I know I have the right size and know the process will work, I need to still clean up the masters.  I will fill the grain and any blemishes, add detail like rivets and panel seams, and then seal the piece and lightly wax it to make it easy to remove from the plastic.  

Friday, January 30, 2009

Stoves for A-Furnace


I've been working on the A Furnace Stoves a bit as you can see.  The stove structures are built from Rix water tank kits.   For those of you unfamiliar with these kits, they come in three sizes - 25' 40' and 60' and in two different styles of tops - peaked and flat.  The kits are very easy to build, as are most Rix items.  The tanks are built in 8 or 9 scale foot lifts, with each lift comprising of 6 pieces.  The overlap between pieces are at rivet seams so the look is excellent.  Additionally, the overlapping sections have a lip that extends downward that aligns each section on top of the previous one.   One thing that you do need to know is that there are three different sizes of panels (heights) and within each size there are anywhere from two to three styles of panels.   A guide to Rix sections:

Smallest in Height - three rivet lines on vertical seams - 3 versions - no horizontal rivets, horizontal rivets on one edge, horizontal rivets on both edges

Medium Height - two rivet lines on vertical seams - 2 versions - with or without horizontal rivets

Large Height - four rivet lines - 2 versions - with or without horizontal rivets

The first stove I built I just grabbed sections until I hit the prototype height (tallest stove in photo)   If I had to do it again I would have put more thought into it as some of the sections don't come in the smaller packages so I end up buying just the 60' to match the existing pattern.  Also, I end up with extras.  As I said in an early post, the tank sections scale out at 24' diameter as opposed to the actual McClure Stove prototype diameter of about 22' - a sacrifice of scale for the awesome rivet detail on the Rix tanks.    While we are on the subject of these tanks - I also plan to use them for the twin precipitator units located behind A furnace and for the stoves on B furnace.  

I'm going to work on the tapered tops for the stoves this weekend.  I recently purchased Jeff Borne's DVD - Superdetailing a Walthers Blast Furnace Part 2     It turned out to be much better than I ever expected - he's an awesome modeler and the DVD changed my thinking on my approach to a few things.  The reason I started with Part 2 is that he has a section on Three-Pass Stoves.   For the stove tops I originally was going to use either individual wood turnings or resin castings of a wood master.  Borne used vac-formed Plastruct conical sections to good effect.   Not wanting to wait for a Plastruct order, I'm going to create a master, along with a master for the two-pass stove tops on blast furnace B and maybe a few other small parts and vac form these parts from styrene.  Hopefully there will be more of this on the next post.

I started to install my new NCE DCC system this week - for whatever reason after switching the Dynamis system out for the NCE I got a short.  I couldn't find anything obvious so I ended up disconnecting all my feeds and slowly putting them back on.  I still haven't found the short, but have traced it back to the inner loop rail.  The system is pretty nifty for what I have up and running.  Finally we can both control trains at one time since we now have two cabs, and hopefully more to come.  Of course Jimmy and myself got a bit immature (he's entitled, I'm 42) and started chasing each other back and forth until we slammed two $130 engines into each other pretty hard.  We also got a kick out of stealing control from each other of their engines.  Hopefully we will grow up a bit once it's all up and running.  

We also averted a near divorce with the wife earlier this week - just prior to last weekend's four figure spending spree at the Springfield train show I received a call from Bruce, the proprietor of Sattlers - one of the few remaining train stores in the area - that an order had come in - two Walther's Brownhoist cranes and the Plastruct Sintering Plant kit.   I pre-warned the boss(wife) that I would have to pick up and PAY for these items the monday following our jaunt to Mass.   However, by the time I arrived at Sattlers on monday, my other order for the Walther's Electric Furnace kit that was due in February or March was there.   After some shameful un-manly groveling via cell phone and Bruce's price reduction (Fall of Siapan Sale) credit was secured and the kit was mine.  

Sunday, January 25, 2009

Cha Ching


I've just returned from the train show in West Springfield - It was my first time there and I think I'm suffering from major model train overload.  There was so much to see and to spend money on.  Figuring this would be the case, we brought a big wad of cash, opting to leave the cards at home.  Something about handing cash to someone gives me anyway, a bit more self control than just swiping a card.   Also, I went with a purpose - to secure a new DCC system for the layout.  I figured there would be show specials that would offset the cost of driving to Mass. a bit.  Going to the show I would say I was 99% committed to buying the Digitrax Super Chief - In reality, I ended up with the NCE system.

What happened?  Well basically I talked to a lot of people at the show.   Here is a list of what changed my mind:
  • At least 50% of the layouts at the show were using NCE - didn't see one using Digitrax
  • The NCE handheld throttle was much easier to use and it's fit and finish was generally nicer.  I had never actually used either and picking both up for the first time and operating trains I was able to pretty much figure out the NCE right off the bat - I had to ask for a lot of help with the Digitrax - it seemed a bit complicated for no good reason.   To be sure, we would have mastered the Digitrax and since we aren't really going to be handing throttles to people and expecting them to learn them this isn't that big of deal, however, it goes to the overall design in my opinion - why make things overly complicated when there is an easier way?  Also, again it partially boiled down to the controller was just nicer for lack of a better word  - both the display and the housing.  
  • Cost - The NCE was more expensive than the Digitrax system was, however, the NCE has a built in serial port for computer interfacing, which we plan to do using JMRI software.  So when you factor in purchasing the Digitrax computer interface separately the difference in costs was only around $30 or so.  
  • I had recently heard quality control issues surrounding Digitrax related to a move - may or may not have been true
  • The NCE system can be updated - the Digitrax cannot.
The system I purchased was the NCE Power Pro - 5amp.  I also purchased an additional controller - the Cab04p,  DCC Specialities Magna Force power supply, DCC Specialties PSX Intelligent Circuit Breakers for  creating power districts, and four fascia panels.  

In addition to this system I bought some more Rix Tanks for building the stoves for the blast furnace, a bunch of detail parts from Tichy and Crow River and others, a GE 44 tonner, and a few other little items.   I could have spent probably twice as much on other good deals or hard to find items, but I'll wait till next year.  Oh, almost forgot - I bought a Miller Engineering sign - General Electric - I was a little hesitant to purchase one of these until I actually saw one in person.   They aren't perfect in that the none graphics portions of the sign are clear plastic, but in the dark they look awesome - I plan to add lighting to most of the layout as it is built.   I'll probably get a few more of these, but they aren't cheap - $45 for the GE one.    This week, I talked to an old friend of mine, a toy designer and inventor, about using this material inside the cast house to simulate the hot iron - he didn't think it would be workable due to the space available in the runners. 

I did get some work done on the layout -  I laid most of the track for approaches to Blast Furnace B, and for the pig casting machine and possibly an electric melt shop.  I've refined my plans a bit and I believe I can fit the pig caster, electric melt shop, blowing house, and boiler house all in the space behind the furnaces, without looking too crowded.  I've also been working on the Plastruct Steel Mill building kit that I was given for Christmas - it's about 75% done and slightly modified from the plans.  By the way, calling this a "kit" is a bit of a stretch, it's basically a set of plans and directions and a pile of scratchbuilding materials.  

Monday, January 19, 2009

Blast Furnace Complex Begins to Take Shape


The picture on the right shows the current status of the Blast Furnace - A.  When working on my trains I tend to get bored if I spend too much time on one thing, so I keep things interesting by working a little on this, a little on that,....etc.  

Since my last post I have:
  • Started constructing the steel framework around the gas cleaning equipment.  The vertical supports are 3/16 H-Beams, which just coincidentally are the longest structural steel pieces sold by Plastruct.  The horizontals are 3/16 I Beams with smaller angle bracing.  Still to be done are three more frames, plus horizontals, x bracing throughout, platforms and stairs, and a service crane at the top.  I also still need to build two larger thermal expansion goggle valves just for this portion of piping.  
  • Three pass stoves -  To the right of the blast furnace you can see the emerging stove structures (black)  the furthest left one is full height.  Originally the prototype Bethlehem Steel Furnace had five of these McClure three-pass stoves, the fifth one being slightly smaller than the rest, however, it was removed at some point after the 1930s so I have opted to only model the four, shown in an l-shaped configuration.  I am using Rix Oil/Water Tank kits to build the stoves - they are 24' diameter tanks, while the prototype stoves were 22' feet.   Unfortunately, the extra two feet or so per stove added up and caused problems with the track clearances, so I am reworking the track in this section.   The Rix kits actually are assembled in steps - six pieces make up a ring and then the rings get stacked.  You need to pay attention as there are actually 7 different types of rings pieces in the kits - they vary in size and rivet pattern.  I make sure I repeat the pattern that I used on the first stoves so they all match.   I will also used these tanks for the two precipitators.   The base plate is 0.08 styrene
  • Casting house.  I originally cut this out from a block of two inch styrofoam but had height problems with the Walthers Torpedo cars.   I had a layer of 1/4" foam board to the bottom and an 0.08 base.  I am forming the hot metal and slag runners from .125 square styrene strip.  I intend to fill in between the runners with a putty or plaster to give it that rough uneven look.