Built the two cupola stack assemblies. The platforms were made from .060 scraps (cutoffs from building core) and .040 styrene decks. The stacks are thin-wall PVC with Evergreen channel and vac-formed tops. Also worked on overhead pipe and support assembly for dust collector building and cleaned up and primed the water tower.
No comments:
Post a Comment